Replacement Hardwood Conservatory

These works are due for completion in February 2018 and consist of the following:

  • removing the old conservatory and altering the dwarf walls to the permiter so the door loactions could be changed
  • supplying and installing chamfered stone cills to the top of the dwarf walls
  • supplying and installing one new hardwood, spray paiinted 'A rated conservatory including a cavuty tray and new leadwork between the junction of the new frame and existing house wall
  • repointing the flags internally and supplying and installing one new column radiator
  • constructing new stone steps from the conservatoiry into the existing garden
Project Type: