Converting Storage Room into Ensuite

This work was completed in June 2014 and consisted of converting the existing storage/airing room to the first floor into an ensuite which could be accessed from both bedrooms, including removing part of a internal loadbearing wall, supply and installation of sanitaryware, fix and second fix plumbing including connecting into the existing soil pipe, first and second fix electrics including mechanical extract ventilation and tiling.

Project Type: