Constructing Detached Garage & Workshop

This project was started mid March 2015 and was complete in September 2015, the works consist of the following:

  • Demolishing the existing timber framed garage
  • Constructing a new detached garage and workshop from reclaimed stone walling, a blue slate roof & Velfac windows and folding doors.
  • Drainage including foul, surface water and land drains
  • New electric and water supply
  • External paving and resurfacing works.
  • First & Second fix Plumbing and installation of WC
  • First and Second fix Joinery
  • Tiling
  • Decoration