Refurbishing Family Bathroom

This work was started and completed in June 2016 and consisted of the following:

  • Removing the existing bathroom, flooring and tiles
  • Over-skimming walls and ceiling
  • Supply and laying new oak engineered flooring
  • Tiling wall and shower enclosure
  • Installing new bathroom furniture
  • First & second fix joinery including constructing cupboards around boiler. 
  • First and second fix electrics
  • Decoration