Refurbishment to Ground Floor Following Floods

This work was started in in March and completed in May 2016.

The works consisted of the following:

  • stripping out following the floods
  • renewing the timber floor joists and tiling the whole of the ground floor
  • removing the plaster to  height of 1.5m and replastering with a lime plaster
  • uncovering the fire surround to the living room and installing a new gas stove
  • supplying and installing new kitchen and appliances
  • first and second fix joinery
  • moving sockets to higher level
  • decoration