External & Internal Alterations

This project was completed in December 2016, the works consisted of the following:-

  • Externally-
    • sandblasting and re-pointing the external elevations with a lime mortar
    • installing new GRP gutters and cast effect downpipes
    • insulated render to gable wall
    •  
  • Internally-
    • supplying and installing an oak staircase
    • installing a downstairs WC
    • installing insulated plasterboard and plastering to external walls to upgrade the thermal performance of the property
    • creating a third bedroom and installing a new family bathroom including tiling. 